Downtown Corridor Project Update

Downtown Corridor Project Update

On September 27, the town held a public forum at the Senior Center to update the public on the Downtown Corridor Project. This Forum was intended to present a summary of the Downtown Project and to inform the public on the proposed changes the Project will make to Main Street from Wood Street to Ash Street. It included an open forum where residents could view the project plans and renderings of the proposed work, a formal presentation by the Town, and a formal Q&A session.

View the PowerPoint Presentation (PDF)

Information Sheet (PDF)

Project Plan Aerial View (PDF)

Watch the forum on the HCAM YouTube Channel: https://youtu.be/SCyfKrORMng